The ground is thawing allowing us to finally lift our panels up and mount them on top of the woodshed. The roof is already set to the ideal angle and facing south. A nerve-wracking move, but well worth it in the end.
We will be coming back to this project for a few more finishing touches as everything finishes thawing such as getting the ground rod all the way into the ground, silicone our screw holes under the panels, and finish all the electrical. But for now the panels are in working order in their final resting place.
Our Mailing Address: PO Box 13372, Trapper Creek, AK 99683
E-Mail: remotelifealaska@gmail.com
Website: https://remotelifealaska.com
Instagram: https://instagram.com/remotelifealaska?igshid=NTc4MTIwNjQ2YQ==
A few ways to support us:
https://paypal.me/RemoteLifeAlaska
Join this channel to get access to perks:
https://www.youtube.com/channel/UCJ-sQ_mHnGH7cxWimZdKV1A/join
Shop our favorite things in our Amazon Storefront and through our Amazon affiliate links, which will earn us a small commission at no additional cost to you.
https://www.amazon.com/shop/remotelifealaska?ref_=cm_sw_r_cp_ud_aipsfshop_aipsfremotelifealaska_V2XJ18M0MCEJ4SH5ZWNX
Send us something from our Amazon Wishlist: https://www.amazon.com/registries/gl/guest-view/W1C5XKPH34TJ
source